After figure out our schedule for the month, we came up with the date for the first shooting day on 25th March 2023 on Saturday afternoon. Luckily, we were able to borrow multiple equipment such as lighting from the school for the shooting day.
From the feedback (section D) of the plan, you can already some problems that we met on the shooting day. First of all, the setting take much longer than we expected. Although I had set some of the lighting up before hand but it still take a long time to finish the rest of the set up due to the complexity of the background and that we have not consider the size of the window so we need to figure out method to block the light from the window. Secondly, the light was not as strong as we expected to create wanted effect (the silhouette) like what we want at the beginning so changes needed to be made. Moreover, it took a lot of times for us to figure out which is the best way to change the color of the light to red light (in the end, we decide to use a red nilon bag to change the color of the light. Lastly, I as the cinematographer, forgot to turn off the camera when we were discussing and we only had one battery for the camera so it leads to the accident that we could not finish all the shooting because the camera was out of battery. This create the needed for another shooting day in the near future!
Anyway, here are some behind the scene (BTS) pictures and videos:
Comments